
Cincinnati Union Terminal
Cincinnati Union Terminal trust Edge Power Solutions to provide Class 2 remote power to over 500 ONT’s in its’ new renovated historic facility. EPS is proud to have been a small part of this $300 Million project that returned this iconic location back to its’ glory.
The ability of Edge Power Solutions to provide remote power & splitter connections in variable unit sizes was integral to the GPON design. The flexibility allowed power to be placed close to the edge in sparse and high concentration areas.
The small form factor of Edge Power Solutions PDU’s allowed for the use of smaller TC’s for less architectural impact in this historic facility.

American Woodmark New Headquarters
American Woodmark chose EPS to provide Class 2 remote power for the Optical LAN network at it’s new headquarters. EPS PDUs are providing power for more than 600 ONTs
Key factors in the decision:
- More efficient use of limited rack space
- Flexible unit sizes
- Reliability MTBF 16.5 Yrs.
- Ease of installation and use.

Marriott AC Madison Wisconsin
Edge Power Solutions was selected to provide Class 2 remote power to the GPON network at this marquee property in Downtown Madison, WI.
Project Details:
- 292 Rooms
- Rooftop Restaurant
- World Class Meeting Space
The compact design of EPS PDUs allowed for a higher concentration of connections reducing the number of telecom closets required.

Circa Hotel Casino
EPS was selected to provide Class 2 systems power to this premier property in downtown Las Vegas.
Project Details:
- 44 Stories
- 780 Rooms
- High Voltage DC Input
Under EPS Power:
- Guestroom Floor L.E.D Lighting
- In-Room network switching
The 98W per port capability of the EPS PDUs in combination with a higher wire gauge allowed for higher concentration of L.E.D. lights per output vs POE power.

Wyoming University Arena
Project Details:
- Optical LAN & DAS
- High Voltage DC Input
EPS Custom ultralight enclosures were used for installation in areas with sensitive weight requirements.

ATT Stadium
EPS is proud to have been selected to provide the Class 2 remote power for the new distributed antenna system supporting 5G for AT&T Stadium the home of the Dallas Cowboys.
- DAS
- High Voltage DC Input
EPS compact form factor and high voltage DC interface capability were key factors in the selection.

Marriott Resort Waikiki Hawaii
EPS was selected to provide remote Class 2 power for the GPON insallation at this popular beachfront destination.
Project Details:
- 1700 Rooms
- Spa & Resort Space
- World Class Meeting Space
EPS was selected based on the ability to provide a safe and compact power distribution to interface with a centralized Digital Electricity™ System.

The District Wharf Washington DC
The District Wharf in Washington DC chose EPS to provide remote Class 2 power to the sitewide Optical LAB network for its’ $5 Billion waterfront Phase I & II development.
- 11 Mixed Use High Rise Towers
- 6000 Seat Anthem Auditorium
- 5 Multiuse Piers
- 3 Hotels, 25 Restaurants
- 3/4 Mile 2 Level Under Ground Garage
EPS PDUs provide remote power to ONTs located from end to end of this expansive waterfront development.
The Site-Wide GPON System provides Wi-Fi, network, BMS, Security and AV connections for common areas of the entire site.

Additional Satisfied Customers
- Major Transportations Entities
- Major Manufacturing Organizations
- K-12 and Secondary Education
- Hospitality Chains
- Healthcare and Assisted Living
- Over 600 Successful POL, DAS, and LED Lighting projects under EPS Class 2 power.